completed engg projects

Engineers Associates Limited (EAL) has been providing consultancy services to various clients in different fields since the inception of the firm in 1985. EAL has broadened the field of activities and they now cover almost every aspect from preliminary study to final design, construction supervision and commissioning in all its ramifications as per requirement of the client. EAL now enjoys a reputation for its commitment to provide the highest level of professional services.

EAL has completed the following engineering projects with with a very high client satisfaction.

Sl. No.
Name of Project
ClientsConsultancy Fees
(Million Taka)
Status/ Project Period
1IEE Study for Preparatory Survey for the Construction and Operation of imported Coal Transshipment Terminal Project in Matarbari Area in BangladeshNippon Koie, JapanUSD 302,915Completed (August. 13, 2015 to November 30, 2015)
2Preparatory Survey on Dhaka – Chittagong Main Power Grid Strengthening Project in BangladeshTEPCO, JapanUSD 9,000Completed (April. 17, 2014 to Feb 28, 2015)
3Support for Data Collection on Bilateral offset Credit Mechanism Feasibility Study in Bangladesh (2nd Phase)MRI, Japan3 Million JPYCompleted (July. 03, 2014 to July 30, 2015)
4Technical Examination(Route Survey & Soil Investigation), Social and Environmental Survey on Dhaka – Chittagong Main Power Grid Strengthening Project in BangladeshTEPCO, JapanUSD 302,915Completed (April. 24, 2014 to Feb 28, 2015)
5Topographic Survey and Soil Investigation under JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO17,500 USDCompleted (June 06, 2008 to August 31, 2008)
6Topographic Survey for Gas Pipeline and Transmission Lines under JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO13,650 USDCompleted (Oct. 01, 2008 to Nov.’ 30, 2008)
7Environmental and Social Study under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO36,500 USDCompleted (May 18, 2008 to December 26, 2008)
8Underground Water Investigation under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO53,000 USDCompleted (August 10, 2008 to December 15, 2008)
9Underground Water Modelling Analyses under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO22,500 USDCompleted (October 01, 2008 to December 15, 2008)
10Operation And Maintenance Baseline Survey under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO13,230 USDCompleted (June 15, 2008 to December 31, 2008)
11Organizational Structure Study (2nd Year) under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCO6,300 USDCompleted (June 15, 2008 to December 31, 2008)
12Environmental Impact Assessment (EIA) Study for Khulna 150 MW Peaking Power Plant Construction Project at KPS, Goalpara, Khulna” under NWPGCLNWPGCL0.97Completed (Nov. 03, 2009 to Feb. 03, 2010)
13Environmental Impact Assessment (EIA) Study for Sirajganj 150 MW Peaking Power Plant Construction Project at Sirajganj” under NWPGCLNWPGCL0.975Completed (Nov. 01, 2009 to Feb. 01, 2010)
14Initial Environmental Examination (IEE) for 225 MW CCPP at Khulna 150 MW Peaking Power Plant Construction Project Area, Goalpara, Khulna.NWPGCL9.35Completed (Jan 30,2012 to July 15, 2012)
15Initial Environmental Examination (IEE) Work for Sirajganj 225 MW Combined Cycle Power Plant area, Saydabad, Sirajganj under Project Director, Sirajganj 150 MW PPPC Project NWPGCL, Dhaka.NWPGCL9.3Completed (May 16,2012 to Aug 15, 2012)
16Feasibility Study Work for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MWCCPP at Goalpara, Khulna under Project Director, Khulna 150 MW PPPC Project NWPGCL, Dhaka.NWPGCL9.3Completed (Jul 18,2012 to Oct 17, 2012)
17Feasibility Study Works for Sirajganj 225 MW Combined Cycle Power Plant Construction Project area, Saydabad, Sirajganj under NWPGCLNWPGCL9.95Completed (Aug. 07, 2013 to Nov. 07, 2013)
18Environmental Impact Assessment Study (EIA) for Upgradation of Sirajganj 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project area Saydabad, Sirajganj under NWPGCLNWPGCL9.9Completed (Jul. 16, 2013 to Oct. 16, 2013)
19Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Sylhet and Moulvibazar Towns (Group-A) under 18 Town Power Distribution Project, Phase-II”.BPDB4.91Completed (Oct.’ 99 to June’ 05)
20Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Mymensingh, Tangail and Jamalpur Towns (Group-B) under 18 Town Power Distribution Project, Phase-II”.BPDB8.78Completed (Oct.’ 99 to June’ 05)
21Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Harogram 33/11 KV Sub-station commanding area and its adjoining important areas (Group-A) under Greater Rajshahi Power Distribution Project, Phase-II.BPDB4.64Completed (Nov.’ 99 to June’ 05)
22Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Katakhali 33/11 KV Sub-station commanding area, Natore Municipality area and its adjoining important areas including 132 KV Natore-Rajshahi Line (Group-C) under Greater Rajshahi Power Distribution Project, Phase-II.BPDB5.8Completed (Nov.’ 99 to June’ 05)
235-Town Power Distribution System Development Project, Khulna City Corporation(Group-A) under West Zone Power Distribution Company Limited (WZPDCL)WZPDCL4.971Completed (Aug.’ 05 to Aug.’ 08)
24System Loss Reduction Pilot Scheme of BPDB and Loss Reduction Pilot Project of DESA in Association with Tokyo Electric Power Services Company Limited (TEPSCO), JapanBPDB/DESA20Completed (Oct.’ 96 to June’ 04)
2516 Towns Power Distribution Project, Brahman Baria TownBPDB5.93Completed (March’ 90 to Aug.’ 95)
2616 Towns Power Distribution Project, Chandpur Town BPDB2.89Completed (March’ 90 to Aug’ 95)
27Consultancy Services for Sylhet Palli Bidyut Samity-2REB6.67Completed (Feb’ 97 to Aug’ 03)
28Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2Sylhet PBS-27.76Completed (Sept’ 03 to Aug’ 06)
29Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2Sylhet PBS-22Completed (Sep.’ 06 to June’ 07)
30Feasibility Study of Greater Chittagong Power Distribution Project, Phase-IIIBPDB1.8Completed (Oct’ 96 to July’ 97)
31Rehabilitation and Expansion of Power System in Off-shore Island of Hatiya Damaged by Cyclone and Tidal Surge under Cyclone Damaged Rehabilitation ProjectBPDB2.02Completed (March’ 93 to June’ 97)
32Barind Integrated Irrigation Pump Electrification Project (BIIPEP)BPDB3.45Completed (Oct’ 88 to April’ 90)
33Consumer Census of Chittagong Electric Supply, Lot-1, BPDBBPDB1.59Completed (Oct’ 90 to Nov’ 92)
34Survey of Assets of Dhaka Electric Supply, Group-C, BPDB (Now DESA)BPDB1.82Completed (June’ 91 to March’ 92)
35Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Mirpur Circle, GDPDP, DESA (Former BPDB)BPDB3.6Completed (Jan’ 88 to April’ 89)
36Supplying of Local Consultancy Services for Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Narayanganj Circle GDPDP, DESA (Former BPDB).BPDB2.19Completed (May’ 89 to June’ 90)
37Surveying and mapping of D.C.S sheets (1:1200 scale) at Keraniganj Area under GDPDP, DESA (Former BPDB). BPDB2Completed’ (90 to July’ 90)
38Action Plan for Performance Improvement of Bangladesh Power Development Board for Improvement of Present Engineering Practices, Safety Rules and Procedures in Association with Coopers and Lybrand Deloitte of UKBPDB0.4Completed (Sep’ 90 to Nov’ 90)
39Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets and Stores of all Unit Offices under the Payment Jurisdiction of Shahjibazar Regional Accounting Offices (RAO), Bangladesh Power Development Board.BPDB0.875Completed (May, 2000 to June, 04)
40Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of Kallyanpur, Pallabi & Kafrul S&D Divisions under DESCODESCO3.52Completed (March’ 07 to November ’07)
41Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of S&D Division, Tongi (West) under DESCODESCO0.995Completed (July’ 07 to November ’07)
42Local Consultancy Services to TEPSCO for JBIC SAPROF Study for Central Zone Power Distribution ProjectTEPSCOUS $ 90,000Completed (June, 2006 to Nov.’07)
43Bangladesh Power Sector Reform Study, Ministry of Energy and Mineral Resources (MEMR), GOB (Consultancy Services as Local Associates of London Economics of UK).MEMR1Completed (July’ 96 to Dec’ 96)
44Survey of Physical Condition of Existing Union and Other Level MCH and Family Planning Services Infrastructure including Storage Facilities for Family Planning in Bangladesh and Preparation of a Regular Physical Maintenance PlanMOHFW7.93Completed (Nov’ 92 to Aug’ 93)
45Consultancy Services for Conducting Mouja to Mouja Survey for the Purpose of Finding out the Archaeological Sites in Greater Districts of Khulna, Jessore, Barisal and Kushtia under Directorate of Archaeology (DOA), GOBGOB1.6Completed (July, 94 to June, 05)
4633/11 KV Sub-station Design, Renovation and Augmentation of Distribution System of Chittagong Port Authority (CPA)CPA0.8Completed (Aug’ 87 to Dec, 90)
47Planning and Design, Estimating and Preparation of Tender Document for Construction of Electrical Distribution System in Padma Residential Area under Rajshahi Development Authority (RDA), Rajshahi.RDA0.05Completed (Nov.’ 89 to June, 90)
48Consultancy Services for updating Maps, Collection and verification of Distribution Network Data, Load and Revenue Data for Tangail, Sylhet and Moulvibazar O&M Circles of BPDB.JICA2.4Completed (October 2006 to March 2007)
49Study on Rural Electrification Project utilizing Renewable Energy in Bangladesh as Local Associate of Tokyo Electric Power Company (TEPCO), JapanJBIC1.81Completed (May 2006 to November 2006)
50Local Consultancy Services for Baseline Survey in “The Project on Strengthening Management and Performance Standards in Power Sector of Bangladesh through promotion of Total Quality Management” under Mymensingh O&M Circle of BPDB.TEPCO3.68Completed (December 2006 to February 2007)
51Survey of Semi-Pucca Buildings of Banshkhali and Kutubdia Thanas (Former Upazila) Damaged by the Devastating CycloneBRAC0.03Completed (Aug.’ 91 to Oct.’ 91)
52Preparing Staking Sheets and other Related Works of Naogaon District, under Barind Deep Tubewell electrification projects of BMDABMDA0.16Completed (March’ 02 to June, 03)
53USAID/BANGLADESH – Improved Performance of Bangladesh Energy Sector – Work PlanUSAID/BD4Completed
54Study & Preparation of Quarterly Reports of Energy Sectoral updates in Bangladesh.JBIC1Completed (Aug.’ 03 to July’ 04)
55M&E Consultancy for construction of new factory of Hop Lun (BD) Ltd. at Dhaka Export Processing Zone, Savar, Dhaka. Hop Lun (BD) Ltd.1Completed (Aug.’ 03 to Dec.’ 04)
56Management Consultancy for West Zone Power Distribution Co. Ltd. (WZPDCL)WZPDCL0.291Completed
57BPDB Pre-Payment Metering Pilot Project, Chittagong as Sub-consultant of Fichtner GmbH & Co. KG, Germany.BPDB1,59,000 EURCompleted (March’06 -Extended to June’08)
58Local Consultancy Services to TEPCO for JICA Total Quality Management (TQM) project.TEPCOUS $ 21,000Completed (Feb’07 - to Oct’09)
59Assessment of Power Demand Requirement, Determination of Number and Capacity of 33/11 kV S/S, Planning of 33 kV Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. DESCO0.285Completed (Mar.01, 09 to Jul. 31, 09)
60Load Growth Study of Mirpur Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQDESCO0.282Completed (Oct. 21, 2009 to Jan. 21, 2010)
61Load Growth Study of Gulshan-Baridhara Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQDESCO0.297Completed (Feb. 16, 2009 to May. 16, 2010)
62Feasibility Study to ascertain load demand & consumer growth in DESCO area.DESCO0.299Completed (May. 19, 2009 to June. 19, 2010)
63Planning of Distribution Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. DESCO0.285Completed (Mar.01, 09 to Mar. 31, 2010)
64Civil Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 14,300.00Completed (Jan. 2010 to Feb. 2010)
65Social Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 19,564.00Completed (Oct. 2009 to Feb. 2010)
66Environmental Management Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 23,715.00Completed (Oct. 2009 to Feb. 2010)
67Survey of Existing Gas Fired Power Plants Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 34,387.00Completed (Oct. 2009 to Feb. 2010)
68Demand forecast under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 8,000.00Completed (Feb. 2010 to Apr. 2010)
69Civil Survey for Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 33,268.00Completed (Jul. 2010 to Jan. 2011)
70Environmental Management and Social Consideration Study under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 34,816.00Completed (Jul. 2010 to Jan. 2011)
71Survey of Existing GAS P/S (Gas Network) under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 12,320.00Completed (Jul. 2010 to Jan. 2011)
72Route Investigation to Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOUS$ 28,204.00Completed (Jul. 2010 to Jan. 2011)
73JICA Data Collection on Coal Power Master Plan Follow-up in the People's Republic of BangladeshJICA / TEPCOUS$ 48,000.00Completed (Feb. 2011 to Mar. 2012)
74Support services for Survey of JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh. ( 8 Mission)JICA / TEPCOUS$ 55,445.00Completed (Oct. 2009 to Mar. 2012)
75Retainer Consultancy Services for Sherpur Palli Bidyut SamitySherpur PBS5.43Completed (Jul.’ 08 to Sep’ 11)
76Retainer Consultancy Services for Gopalganj Palli Bidyut SamityGopalganj PBS5.46Completed (Jul.’ 08 to Sep’ 11)
77Preparing detail location of existing overhead line or underground cable in the alignments of proposed Elevated Expressway shown in Map.DESCO0.15Completed (July 07, 10 to Sep. 07, 10)
78Local Support for Data Collection on Bilateral Offset Credit Mechanism Feasibility Study (BOCM F/S) in the People’s Republic of Bangladesh.JICA / TEPCOUS$ 14,915.00Completed (Sept. 17, 2012 to Feb. 20, 2013)
79Support for Data Collection on Bilateral offset Credit Mechanism Feasibility Study in BangladeshMRI, JapanUS$ 14,915Completed (Sept. 17, 2012 to Feb 20, 2013)
80Construction Procurement Survey, Land/Plant Survey and Oceanographic Survey under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh.JICA / TEPCOUS$ 2,99,800.00Completed (July 26, 2012 to June 30, 2013)
81Natural and Social Environmental Components and Route Survey on new 400kV Transmission Line under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh.JICA / TEPCOUS$ 1,32,250.00Completed (July 26, 2012 to June 30, 2013)
82Support services for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project by JICA, TEPSCO, Japan under JICA.JICA / TEPCOUS$ 27,915.00Completed (Jul. 2012 to Jun. 2013)
83Checking and correction of bid documents, preparing RFP with complete TOR for engaging consultant for survey and preparation of digitalized map and database for all DPDC feeders and network elements, assisting evaluation of proposals / bids etc.DPDC9.34Completed (Jul. 22, 2013 to Nov. 22, 2013)