completed engg projects
Engineers Associates Limited (EAL) has been providing consultancy services to various clients in different fields since the inception of the firm in 1985. EAL has broadened the field of activities and they now cover almost every aspect from preliminary study to final design, construction supervision and commissioning in all its ramifications as per requirement of the client. EAL now enjoys a reputation for its commitment to provide the highest level of professional services.
EAL has completed the following engineering projects with with a very high client satisfaction.
Sl. No. | Name of Project | Clients | Status/ Project Period |
---|---|---|---|
1 | Environmental Consultancy Services on AK Khan Private Economic Zone (AKPEZ) Project450MW Bheramara Combined Cycle Power Station in Bangladesh | A K Khan & Company Ltd. | Completed (Dec, 30, 2015 to Mar. 30, 2017) |
2 | Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Sherpur PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion Project | BREB | Completed (Sep. 23, 2012 to Jun. 30, 2017) |
3 | Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Gopalgonj PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion Project | BREB | Completed (Sep. 23, 2012 to Jun. 30, 2017) |
4 | Consultancy Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Haluaghat, Gauripur, Eshorganj, Dapunia, Fulbaria, Fulpur, Nalitabari, Nokla, Shreebordi and Jhenaighati ESU under Central Zone Power Distribution Project, BPDB, Mymensingh (Package no. – 07) | BPDB | Completed (05 Dec. 2013 to 15 June. 2016) |
5 | Consultant Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Kalihati, Sokhipur, Bhuapur, Ghatail, Shorishabari, Trishal and Gaforgaon ESU under Central Zone Power Distribution Project, BPDB (Package no. – 08) | BPDB | Completed (05 Dec. 2013 to 15 June. 2016) |
6 | Consultancy Services for Preparation of Drawing, Design, Engineering and Supply of Supervisory Personal for Construction of 33/11kV Regular type and 33/11 kV Rural type Sub-Stations at different locations under Central Zone Power Distribution Project. (Package No. – 09), BPDB. | BPDB | Completed (05 Dec. 2013 to 10 June. 2016) |
7 | ITES Services for Technical Examination, Hydro Power Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPSCO | Completed (Nov, 27, 2014 to Jul. 25, |
8 | ITES Services for Technical Examination, Operation and Maintenance Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh. | TEPSCO | Completed (Nov, 27, 2014 to Jul. 25, 2016) |
9 | ITES Services for Technical Examination, Port Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh. | TEPSCO | Completed (Nov, 27, 2014 to Jul. 25, 2016) |
10 | ITES Services for Technical Examination of Related Information for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPSCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
11 | ITES Services for Survey of Environmental and Social Considerations for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
12 | ITES Services for Overall Study of LNG Receiving Terminal for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
13 | ITES Services for Survey of Natural Gas Exploration and Supply for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
14 | ITES Services for Data Collection/processing and Stakeholder Relations for Analysis of Primary Energy Supply and Demand for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh | TEPCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
15 | ITES Services for Survey of Power System Operation for Improving Power Quality for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh. | TEPCO | Completed (Nov, 30, 2015 to Jul. 25, 2016) |
16 | Retainer Consultancy Services for Sherpur Palli Bidyut Samity | Sherpur PBS | Completed (Dec 10, 2011 to Apr. 30, 2015) |
17 | Consultant Services for Survey, Planning, Design and Supervision of Lines and Sub-station Construction and Renovation Works of Mymensingh S&D – 1, Mymensingh S&D – 2 and Sherpur ESU and adjoining areas under Central Zone Power Distribution Project, BPDB, Mymensingh. (Package no. – 03). | BPDB | Completed (12 Jan. 2011 to 17 Nov. 2015) |
18 | Technical Examination, Social and Environmental Survey for JICA’s Preparatory Survey on Dhaka – Chittagong Main Power Grid Strengthening Project in People’s Republic of Bangladesh | TEPCO, Inc | Completed (Apr. 2014 to Feb. 2015) |
19 | Support Services for “The Preparatory Survey on Dhaka - Chittagong Main Power Grid Strengthening Project” | TEPCO, Inc | Completed (Apr. 2014 to Feb. 2015) |
20 | IEE study of preparatory survey for the construction and operation of imported coal transshipment terminal project in Matarbari area | Nippon Koei | Completed (Aug, 2015 to Dec, 2015) |
21 | Retainer Consultancy Services for Gopalganj Palli Bidyut Samity | Gopal-ganj PBS | Completed (Dec 01, 11 to Mar. 31, 2015) |
22 | Consulting services of Engineering, Supervision & design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity under REEGPBS Project | BREB | Completed (Jan 25, 2012 Jun. 24, 2014) |
23 | Engineering Supervision & Design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity Under REEDDP-1 Project | BREB | Completed (April 31, 2011 to Jun 30, 2014) |
24 | Engineering Supervision & Design for Electrical Distribution System of Sherpur Palli Bidyut Samity Under REEDDP-1 Project | BREB | Completed (April 2011 to June 2014) |
25 | Supporting Services to JICA for “The Project for Development of Energy Efficiency and Conservation Master Plan for the People’s Republic of Bangladesh | JICA | Completed (Mar. 2014 to Jun. 2014) |
26 | Local Support for Data Collection on Bilateral Offset Credit Mechanism Feasibility Study (BOCM F/S) in the People’s Republic of Bangladesh. | JICA / TEPCO | Completed (Sept. 17, 2012 to Feb. 20, 2013 |
27 | Construction Procurement Survey, Land/Plant Survey and Oceanographic Survey under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh. | JICA / TEPCO | Completed (July 26, 2012 to June 30, 2013) |
28 | Natural and Social Environmental Components and Route Survey on new 400kV Transmission Line under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh. | JICA / TEPCO | Completed (July 26, 2012 to June 30, 2013) |
29 | Support services for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project by JICA, TEPSCO, Japan under JICA. | JICA / TEPCO | Completed Jul. 2012 to Jun. 2013 |
30 | Checking and correction of bid documents, preparing RFP with complete TOR for engaging consultant for survey and preparation of digitalized map and database for all DPDC feeders and network elements, assisting evaluation of proposals / bids etc. | DPDC | Completed (Jul. 22, 2013 to Nov. 22, 2013) |
31 | Environmental Impact Assessment Study (EIA) for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW CCPP at Khulna Power Plant Construction Project area, Goalpara, Khulna under NWPGCL | NWPGCL | Completed (Mar. 13, 2013 to Jun. 13, 2013) |
32 | Feasibility Study Works for Sirajganj 225 MW Combined Cycle Power Plant Construction Project area, Saydabad, Sirajganj under NWPGCL | NWPGCL | Completed (Aug. 07, 2013 to Nov. 07, 2013) |
33 | Environmental Impact Assessment Study (EIA) for Upgradation of Sirajganj 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project area Saydabad, Sirajganj under NWPGCL | NWPGCL | Completed (Jul. 16, 2013 to Oct. 16, 2013) |
34 | Environmental Impact Assessment (EIA) Study of Sirajganj 225 MW Combined Cycle Power Plant Project (2nd Unit- Dual Fuel), Saydabad, Sirajganj | NWPGCL | Completed (Jul. 16, 2013 to Oct. 16, 2013) |
35 | Initial Environmental Examination (IEE) for 225 MW CCPP at Khulna 150 MW Peaking Power Plant Construction Project Area, Goalpara, Khulna. | NWPGCL | Completed Jan 30,2012 to July 15, 2012 |
36 | Initial Environmental Examination (IEE) Work for Sirajganj 225 MW Combined Cycle Power Plant area, Saydabad, Sirajganj under Project Director, Sirajganj 150 MW PPPC Project NWPGCL, Dhaka. | NWPGCL | Completed May 16, 2012 to Aug 15, 2012 |
37 | Feasibility Study Work for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MWCCPP at Goalpara, Khulna under Project Director, Khulna 150 MW PPPC Project NWPGCL, Dhaka. | NWPGCL | Completed Jul 18,2012 to Oct 17, 2012 |
38 | JICA Data Collection on Coal Power Master Plan Follow-up in the People's Republic of Bangladesh | JICA / TEPCO | Completed Feb. 2011 to Mar. 2012 |
39 | Support services for Survey of JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh. ( 8 Mission) | JICA / TEPCO | Completed Oct. 2009 to Mar. 2012 |
40 | Retainer Consultancy Services for Sherpur Palli Bidyut Samity | Sherpur PBS | Completed (Jul.’ 2008 to Sep’ 2011) |
41 | Retainer Consultancy Services for Gopalganj Palli Bidyut Samity | Gopalganj PBS | Completed (Jul.’ 2008 to Sep’ 2011) |
42 | Civil Survey for Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Jul. 2010 to Jan. 2011 |
43 | Environmental Management and Social Consideration Study under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Jul. 2010 to Jan. 2011 |
44 | Survey of Existing GAS P/S (Gas Network) under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Jul. 2010 to Jan. 2011 |
45 | Route Investigation to Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Jul. 2010 to Jan. 2011 |
46 | Environmental Impact Assessment (EIA) Study for Khulna 150 MW Peaking Power Plant Construction Project at KPS, Goalpara, Khulna” under NWPGCL | NWPGCL | Completed Nov. 03, 2009 to Jun. 03, 2010 |
47 | Environmental Impact Assessment (EIA) Study for Sirajganj 150 MW Peaking Power Plant Construction Project at Sirajganj” under NWPGCL | NWPGCL | Completed Nov. 01, 2009 to Jun. 01, 2010 |
48 | Preparing detail location of existing overhead line or underground cable in the alignments of proposed Elevated Expressway shown in Map. | DESCO | Completed (July 07, 2010 to Sep. 07, 2010) |
49 | Civil Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Jan. 2010 to Feb. 2010 |
50 | Social Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Oct. 2009 to Feb. 2010 |
51 | Environmental Management Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Oct. 2009 to Feb. 2010 |
52 | Survey of Existing Gas Fired Power Plants Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Oct. 2009 to Feb. 2010 |
53 | Demand forecast under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh | JICA / TEPCO | Completed Feb. 2010 to Apr. 2010 |
54 | Load Growth Study of Mirpur Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQ | DESCO | Completed (Oct. 21, 2009 to Jan. 21, 2010) |
55 | Load Growth Study of Gulshan-Baridhara Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQ | DESCO | Completed (Feb. 16, 2009 to May. 16. |
56 | Feasibility Study to ascertain load demand & consumer growth in DESCO area. | DESCO | Completed (May. 19, 2009 to June. 19, 2010) |
57 | Planning of Distribution Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. | DESCO | Completed Mar.01, 2009 to Mar. 31, 2010 |
58 | Assessment of Power Demand Requirement, Determination of Number and Capacity of 33/11 kV S/S, Planning of 33 kV Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. | DESCO | Completed (Mar.01, 2009 to Jul. 31, 2009) |
59 | Local Consultancy Services to TEPCO for JICA Total Quality Management (TQM) project. | TEPCO | Completed (Feb’2007 - to Oct’2009) |
60 | 5-Town Power Distribution System Development Project, Khulna City Corporation (Group-A) under West Zone Power Distribution Company Limited (WZPDCL) | WZPDCL | Completed (Aug.’ 2005 to Aug.’ 2008) |
61 | BPDB Pre-Payment Metering Pilot Project, Chittagong as Sub-consultant of Fichtner GmbH & Co. KG, Germany. | BPDB | Completed (March’06 -Extended to June’2008) |
62 | Topographic Survey for Gas Pipeline and Transmission Lines under JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed (Oct. 01, 2008 to Nov.’ 30, 2008) |
63 | Environmental and Social Study under the JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed May 18, 2008 to December 26, 2008) |
64 | Underground Water Investigation under the JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed August 10, 2008 to December |
65 | Underground Water Modelling Analyses under the JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed October 01, 2008 to December 15, 2008) |
66 | Operation And Maintenance Baseline Survey under the JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed June 15, 2008 to December 31, 2008) |
67 | Organizational Structure Study (2nd Year) under the JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed June 15, 2008 to December 31, 2008) |
68 | Topographic Survey and Soil Investigation under JICA Study on 450MW Bheramara Combined Cycle Power Station in Bangladesh | TEPSCO | Completed June 06, 2008 to August 31, 2008) |
69 | Management Consultancy for West Zone Power Distribution Co. Ltd. (WZPDCL) | WZPDCL | Completed |
70 | Local Consultancy Services for Baseline Survey in “The Project on Strengthening Management and Performance Standards in Power Sector of Bangladesh through promotion of Total Quality Management” under Mymensingh O&M Circle of BPDB. | TEPCO | Completed (February 2007 to March 2007) |
71 | Consultancy Services for updating Maps, Collection and verification of Distribution Network Data, Load and Revenue Data for Tangail, Sylhet and Moulvibazar O&M Circles of BPDB | JICA | Completed (October 2006 to March 2007) |
72 | Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of Kallyanpur, Pallabi & Kafrul S&D Divisions under DESCO | DESCO | Completed (March’ 2007 to November ’2007) |
73 | Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of S&D Division, Tongi (West) under DESCO | DESCO | Completed (July’ 2007 to November 2007) |
74 | Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2 | Sylhet PBS-2 | Completed (Sep.’ 2006 to June’ 2007) |
75 | Local Consultancy Services to TEPSCO for JBIC SAPROF Study for Central Zone Power Distribution Project | TEPSCO | Completed (June, 2006 to Nov.’2007) |
76 | Study on Rural Electrification Project utilizing Renewable Energy in Bangladesh as Local Associate of Tokyo Electric Power Company (TEPCO), Japan | JBIC | Completed (May 2006 to November 2006) |
77 | Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2 | Sylhet PBS-2 | Completed (Sept’ 2003 to Aug’ 2006) |
78 | Consultancy Services for Conducting Mouja to Mouja Survey for the Purpose of Finding out the Archaeological Sites in Greater Districts of Khulna, Jessore, Barisal and Kushtia under Directorate of Archaeology (DOA), GOB | GOB | Completed (July, 1994 to June, 2005) |
79 | Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Sylhet and Moulvibazar Towns (Group-A) under 18 Town Power Distribution Project, Phase-II”. | BPDB | Completed (Oct.’ 1999 to June’ 2005) |
80 | Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Mymensingh, Tangail and Jamalpur Towns (Group-B) under 18 Town Power Distribution Project, Phase-II”. | BPDB | Completed (Oct.’ 1999 to June’ 2005) |
81 | Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Harogram 33/11 KV Sub-station commanding area and its adjoining important areas (Group-A) under Greater Rajshahi Power Distribution Project, Phase-II. | BPDB | Completed (Nov.’ 1999 to June’ 2005) |
82 | Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Katakhali 33/11 KV Sub-station commanding area, Natore Municipality area and its adjoining important areas including 132 KV Natore-Rajshahi Line (Group-C) under Greater Rajshahi Power Distribution Project, Phase-II. | BPDB | Completed (Nov.’ 1999 to June’ 2005) |
83 | Study & Preparation of Quarterly Reports of Energy Sectoral updates in Bangladesh. | JBIC | Completed (Aug.’ 2003 to July’ 2004) |
84 | M&E Consultancy for construction of new factory of Hop Lun (BD) Ltd. at Dhaka Export Processing Zone, Savar, Dhaka. | Hop Lun (BD) Ltd. | Completed (Aug.’ 2003 to Dec.’ 2004) |
85 | USAID/BANGLADESH – Improved Performance of Bangladesh Energy Sector – Work Plan | USAID/BD | Completed |
86 | Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets and Stores of all Unit Offices under the Payment Jurisdiction of Shahjibazar Regional Accounting Offices (RAO), Bangladesh Power Development Board. | PBDB | Completed (May, 2000 to June, 2004) |
87 | System Loss Reduction Pilot Scheme of BPDB and Loss Reduction Pilot Project of DESA in Association with Tokyo Electric Power Services Company Limited (TEPSCO), Japan | BPDB/ DESA | Completed (Oct.’ 1996 to June’ 2004) |
88 | Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2 | BREB | Completed (Feb’ 1997 to Aug’ 2003) |
89 | Preparing Staking Sheets and other Related Works of Naogaon District, under Barind Deep Tubewell electrification projects of BMDA | BMDA | Completed (March’ 2002 to June, 2003) |
90 | Feasibility Study of Greater Chittagong Power Distribution Project, Phase-III | BPDB | Completed (Oct’ 1996 to July’ 1997) |
91 | Rehabilitation and Expansion of Power System in Off-shore Island of Hatiya Damaged by Cyclone and Tidal Surge under Cyclone Damaged Rehabilitation Project | BPDB | Completed (March’ 1993 to June’ 1997) |
92 | Bangladesh Power Sector Reform Study, Ministry of Energy and Mineral Resources (MEMR), GOB (Consultancy Services as Local Associates of London Economics of UK). | MEMR | Completed (July’ 1996 to Dec’ 1996) |
93 | 16 Towns Power Distribution Project, Brahman Baria Town | BPDB | Completed (March’ 1990 to Aug.’ 1995) |
94 | 16 Towns Power Distribution Project, Chandpur Town | BPDB | Completed (March’ 1990 to Aug’ 1995) |
95 | Survey of Physical Condition of Existing Union and Other Level MCH and Family Planning Services Infrastructure including Storage Facilities for Family Planning in Bangladesh and Preparation of a Regular Physical Maintenance Plan | MOHFW | Completed (Nov’ 1992 to Aug’ 1993) |
96 | Consumer Census of Chittagong Electric Supply, Lot-1, BPDB | BPDB | Completed (Oct’ 1990 to Nov’ 1992) |
97 | Survey of Assets of Dhaka Electric Supply, Group-C, BPDB (Now DESA) | BPDB | Completed (June’ 1991 to March’ 1992) |
98 | Survey of Semi-Pucca Buildings of Banshkhali and Kutubdia Thanas (Former Upazila) Damaged by the Devastating Cyclone | BRAC | Completed (Aug.’ 1991 to Oct.’ 1991) |
99 | 33/11 KV Sub-station Design, Renovation and Augmentation of Distribution System of Chittagong Port Authority (CPA) | CPA | Completed (Aug’ 1987 to Dec, 1990) |
100 | Planning and Design, Estimating and Preparation of Tender Document for Construction of Electrical Distribution System in Padma Residential Area under Rajshahi Development Authority (RDA), Rajshahi. | RDA | Completed (Nov.’ 1989 to June, 1990) |
101 | Surveying and mapping of D.C.S sheets (1:1200 scale) at Keraniganj Area under GDPDP, DESA (Former BPDB). | BPDB | Completed’ 1990 to July’ 1990 |
102 | Action Plan for Performance Improvement of Bangladesh Power Development Board for Improvement of Present Engineering Practices, Safety Rules and Procedures in Association with Coopers and Lybrand Deloitte of UK | BPDB | Completed (Sep’ 1990 to Nov’ 1990) |
103 | Supplying of Local Consultancy Services for Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Narayanganj Circle GDPDP, DESA (Former BPDB). | BPDB | Completed May’ 1989 to June’ 1990 |
104 | Barind Integrated Irrigation Pump Electrification Project (BIIPEP) | BPDB | Completed (Oct’ 1988 to April’ 1990) |
105 | Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Mirpur Circle, GDPDP, DESA (Former BPDB) | BPDB | Completed (Jan’ 1988 to April’ 1989) |