completed engg projects

Engineers Associates Limited (EAL) has been providing consultancy services to various clients in different fields since the inception of the firm in 1985. EAL has broadened the field of activities and they now cover almost every aspect from preliminary study to final design, construction supervision and commissioning in all its ramifications as per requirement of the client. EAL now enjoys a reputation for its commitment to provide the highest level of professional services.

EAL has completed the following engineering projects with with a very high client satisfaction.

Sl. No.
Name of Project
ClientsStatus/ Project Period
1Environmental Consultancy Services on AK Khan Private Economic Zone (AKPEZ) Project450MW Bheramara Combined Cycle Power Station in BangladeshA K Khan & Company Ltd.Completed
(Dec, 30, 2015 to Mar. 30, 2017)
2Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Sherpur PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion ProjectBREBCompleted
(Sep. 23, 2012 to Jun. 30, 2017)
3Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Gopalgonj PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion ProjectBREBCompleted
(Sep. 23, 2012 to Jun. 30, 2017)
4Consultancy Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Haluaghat, Gauripur, Eshorganj, Dapunia, Fulbaria, Fulpur, Nalitabari, Nokla, Shreebordi and Jhenaighati ESU under Central Zone Power Distribution Project, BPDB, Mymensingh (Package no. – 07)BPDBCompleted
(05 Dec. 2013 to 15 June. 2016)
5Consultant Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Kalihati, Sokhipur, Bhuapur, Ghatail, Shorishabari, Trishal and Gaforgaon ESU under Central Zone Power Distribution Project, BPDB (Package no. – 08)BPDBCompleted
(05 Dec. 2013 to 15 June. 2016)
6Consultancy Services for Preparation of Drawing, Design, Engineering and Supply of Supervisory Personal for Construction of 33/11kV Regular type and 33/11 kV Rural type Sub-Stations at different locations under Central Zone Power Distribution Project. (Package No. – 09), BPDB.BPDBCompleted
(05 Dec. 2013 to 10 June. 2016)
7ITES Services for Technical Examination, Hydro Power Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPSCOCompleted (Nov, 27, 2014 to Jul. 25,
8ITES Services for Technical Examination, Operation and Maintenance Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh.TEPSCOCompleted
(Nov, 27, 2014 to Jul. 25, 2016)
9ITES Services for Technical Examination, Port Survey for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh.TEPSCOCompleted
(Nov, 27, 2014 to Jul. 25, 2016)
10ITES Services for Technical Examination of Related Information for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPSCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
11ITES Services for Survey of Environmental and Social Considerations for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
12ITES Services for Overall Study of LNG Receiving Terminal for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
13ITES Services for Survey of Natural Gas Exploration and Supply for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
14ITES Services for Data Collection/processing and Stakeholder Relations for Analysis of Primary Energy Supply and Demand for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of BangladeshTEPCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
15ITES Services for Survey of Power System Operation for Improving Power Quality for JICA’s Survey on Power System Master Plan 2015 in People’s Republic of Bangladesh.TEPCOCompleted
(Nov, 30, 2015 to Jul. 25, 2016)
16Retainer Consultancy Services for Sherpur Palli Bidyut Samity Sherpur PBSCompleted
(Dec 10, 2011
to Apr. 30, 2015)
17Consultant Services for Survey, Planning, Design and Supervision of Lines and Sub-station Construction and Renovation Works of Mymensingh S&D – 1, Mymensingh S&D – 2 and Sherpur ESU and adjoining areas under Central Zone Power Distribution Project, BPDB, Mymensingh. (Package no. – 03).BPDBCompleted
(12 Jan. 2011 to 17 Nov. 2015)
18Technical Examination, Social and Environmental Survey for JICA’s Preparatory Survey on Dhaka – Chittagong Main Power Grid Strengthening Project in People’s Republic of BangladeshTEPCO, IncCompleted
(Apr. 2014 to Feb. 2015)
19Support Services for “The Preparatory Survey on Dhaka - Chittagong Main Power Grid Strengthening Project”TEPCO, IncCompleted
(Apr. 2014 to Feb. 2015)
20IEE study of preparatory survey for the construction and operation of imported coal transshipment terminal project in Matarbari areaNippon KoeiCompleted (Aug, 2015 to Dec, 2015)
21Retainer Consultancy Services for Gopalganj Palli Bidyut SamityGopal-ganj PBSCompleted
(Dec 01, 11 to Mar. 31, 2015)
22Consulting services of Engineering, Supervision & design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity under REEGPBS ProjectBREBCompleted
(Jan 25, 2012 Jun. 24, 2014)
23Engineering Supervision & Design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity Under REEDDP-1 ProjectBREBCompleted
(April 31, 2011 to Jun 30, 2014)
24Engineering Supervision & Design for Electrical Distribution System of Sherpur Palli Bidyut Samity Under REEDDP-1 ProjectBREBCompleted
(April 2011 to June 2014)
25Supporting Services to JICA for “The Project for Development of Energy Efficiency and Conservation Master Plan for the People’s Republic of BangladeshJICACompleted
(Mar. 2014 to Jun. 2014)
26Local Support for Data Collection on Bilateral Offset Credit Mechanism Feasibility Study (BOCM F/S) in the People’s Republic of Bangladesh.JICA / TEPCOCompleted
(Sept. 17, 2012 to Feb. 20, 2013
27Construction Procurement Survey, Land/Plant Survey and Oceanographic Survey under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh.JICA / TEPCOCompleted
(July 26, 2012 to June 30, 2013)
28Natural and Social Environmental Components and Route Survey on new 400kV Transmission Line under the JICA Study on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh.JICA / TEPCOCompleted
(July 26, 2012 to June 30, 2013)
29Support services for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project by JICA, TEPSCO, Japan under JICA.JICA / TEPCOCompleted Jul. 2012 to Jun. 2013
30Checking and correction of bid documents, preparing RFP with complete TOR for engaging consultant for survey and preparation of digitalized map and database for all DPDC feeders and network elements, assisting evaluation of proposals / bids etc.DPDCCompleted
(Jul. 22, 2013 to Nov. 22, 2013)
31Environmental Impact Assessment Study (EIA) for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW CCPP at Khulna Power Plant Construction Project area, Goalpara, Khulna under NWPGCLNWPGCLCompleted
(Mar. 13, 2013 to Jun. 13, 2013)
32Feasibility Study Works for Sirajganj 225 MW Combined Cycle Power Plant Construction Project area, Saydabad, Sirajganj under NWPGCLNWPGCLCompleted
(Aug. 07, 2013 to Nov. 07, 2013)
33Environmental Impact Assessment Study (EIA) for Upgradation of Sirajganj 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project area Saydabad, Sirajganj under NWPGCLNWPGCLCompleted
(Jul. 16, 2013 to Oct. 16, 2013)
34Environmental Impact Assessment (EIA) Study of Sirajganj 225 MW Combined Cycle Power Plant Project (2nd Unit- Dual Fuel), Saydabad, SirajganjNWPGCLCompleted
(Jul. 16, 2013 to Oct. 16, 2013)
35Initial Environmental Examination (IEE) for 225 MW CCPP at Khulna 150 MW Peaking Power Plant Construction Project Area, Goalpara, Khulna.NWPGCLCompleted Jan 30,2012 to July 15, 2012
36Initial Environmental Examination (IEE) Work for Sirajganj 225 MW Combined Cycle Power Plant area, Saydabad, Sirajganj under Project Director, Sirajganj 150 MW PPPC Project NWPGCL, Dhaka.NWPGCLCompleted May 16, 2012 to Aug 15, 2012
37Feasibility Study Work for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MWCCPP at Goalpara, Khulna under Project Director, Khulna 150 MW PPPC Project NWPGCL, Dhaka.NWPGCLCompleted Jul 18,2012 to Oct 17, 2012
38JICA Data Collection on Coal Power Master Plan Follow-up in the People's Republic of BangladeshJICA / TEPCOCompleted Feb. 2011 to Mar. 2012
39Support services for Survey of JICA Study for Master Plan on Coal Power Development in the People’s Republic of Bangladesh. ( 8 Mission)JICA / TEPCOCompleted Oct. 2009 to Mar. 2012
40Retainer Consultancy Services for Sherpur Palli Bidyut SamitySherpur PBSCompleted (Jul.’ 2008 to Sep’ 2011)
41Retainer Consultancy Services for Gopalganj Palli Bidyut SamityGopalganj PBSCompleted (Jul.’ 2008 to Sep’ 2011)
42Civil Survey for Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Jul. 2010 to Jan. 2011
43Environmental Management and Social Consideration Study under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Jul. 2010 to Jan. 2011
44Survey of Existing GAS P/S (Gas Network) under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Jul. 2010 to Jan. 2011
45Route Investigation to Candidate Site (KDP) of P/S under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Jul. 2010 to Jan. 2011
46Environmental Impact Assessment (EIA) Study for Khulna 150 MW Peaking Power Plant Construction Project at KPS, Goalpara, Khulna” under NWPGCLNWPGCLCompleted Nov. 03, 2009 to Jun. 03, 2010
47Environmental Impact Assessment (EIA) Study for Sirajganj 150 MW Peaking Power Plant Construction Project at Sirajganj” under NWPGCLNWPGCLCompleted Nov. 01, 2009 to Jun. 01, 2010
48Preparing detail location of existing overhead line or underground cable in the alignments of proposed Elevated Expressway shown in Map.DESCOCompleted (July 07, 2010 to Sep. 07, 2010)
49Civil Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Jan. 2010 to Feb. 2010
50Social Survey Under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Oct. 2009 to Feb. 2010
51Environmental Management Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Oct. 2009 to Feb. 2010
52Survey of Existing Gas Fired Power Plants Under The JICA Study For Master Plan On Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Oct. 2009 to Feb. 2010
53Demand forecast under the JICA Study for Master Plan on Coal Power Development in the People’s Republic of BangladeshJICA / TEPCOCompleted Feb. 2010 to Apr. 2010
54Load Growth Study of Mirpur Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQ DESCOCompleted (Oct. 21, 2009 to Jan. 21, 2010)
55Load Growth Study of Gulshan-Baridhara Area under DESCO including Planning & Design of 11 kV Network and Preparation of Staking Sheet & BOQ DESCOCompleted (Feb. 16, 2009 to May. 16.
56Feasibility Study to ascertain load demand & consumer growth in DESCO area.DESCOCompleted (May. 19, 2009 to June. 19, 2010)
57Planning of Distribution Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. DESCOCompleted Mar.01, 2009 to Mar. 31, 2010
58Assessment of Power Demand Requirement, Determination of Number and Capacity of 33/11 kV S/S, Planning of 33 kV Network, Preparation of Staking Sheet and BOQ under Purbachal New Town Project. DESCOCompleted (Mar.01, 2009 to Jul. 31, 2009)
59Local Consultancy Services to TEPCO for JICA Total Quality Management (TQM) project.TEPCOCompleted (Feb’2007 - to Oct’2009)
605-Town Power Distribution System Development Project, Khulna City Corporation (Group-A) under West Zone Power Distribution Company Limited (WZPDCL)WZPDCLCompleted (Aug.’ 2005 to Aug.’ 2008)
61BPDB Pre-Payment Metering Pilot Project, Chittagong as Sub-consultant of Fichtner GmbH & Co. KG, Germany.BPDBCompleted (March’06 -Extended to June’2008)
62Topographic Survey for Gas Pipeline and Transmission Lines under JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted (Oct. 01, 2008 to Nov.’ 30, 2008)
63Environmental and Social Study under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted May 18, 2008 to December 26, 2008)
64Underground Water Investigation under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted August 10, 2008 to December
65Underground Water Modelling Analyses under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted October 01, 2008 to December 15, 2008)
66Operation And Maintenance Baseline Survey under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted June 15, 2008 to December 31, 2008)
67Organizational Structure Study (2nd Year) under the JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted June 15, 2008 to December 31, 2008)
68Topographic Survey and Soil Investigation under JICA Study on 450MW Bheramara Combined Cycle Power Station in BangladeshTEPSCOCompleted June 06, 2008 to August 31, 2008)
69Management Consultancy for West Zone Power Distribution Co. Ltd. (WZPDCL)WZPDCLCompleted
70Local Consultancy Services for Baseline Survey in “The Project on Strengthening Management and Performance Standards in Power Sector of Bangladesh through promotion of Total Quality Management” under Mymensingh O&M Circle of BPDB.TEPCOCompleted (February 2007 to March 2007)
71Consultancy Services for updating Maps, Collection and verification of Distribution Network Data, Load and Revenue Data for Tangail, Sylhet and Moulvibazar O&M Circles of BPDBJICACompleted (October 2006 to March 2007)
72Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of Kallyanpur, Pallabi & Kafrul S&D Divisions under DESCODESCOCompleted (March’ 2007 to November ’2007)
73Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets of S&D Division, Tongi (West) under DESCODESCOCompleted (July’ 2007 to November 2007)
74Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2Sylhet PBS-2Completed (Sep.’ 2006 to June’ 2007)
75Local Consultancy Services to TEPSCO for JBIC SAPROF Study for Central Zone Power Distribution Project TEPSCOCompleted (June, 2006 to Nov.’2007)
76Study on Rural Electrification Project utilizing Renewable Energy in Bangladesh as Local Associate of Tokyo Electric Power Company (TEPCO), JapanJBICCompleted (May 2006 to November 2006)
77Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2Sylhet PBS-2Completed (Sept’ 2003 to Aug’ 2006)
78Consultancy Services for Conducting Mouja to Mouja Survey for the Purpose of Finding out the Archaeological Sites in Greater Districts of Khulna, Jessore, Barisal and Kushtia under Directorate of Archaeology (DOA), GOBGOBCompleted (July, 1994 to June, 2005)
79Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Sylhet and Moulvibazar Towns (Group-A) under 18 Town Power Distribution Project, Phase-II”.BPDBCompleted (Oct.’ 1999 to June’ 2005)
80Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Municipality Area of Mymensingh, Tangail and Jamalpur Towns (Group-B) under 18 Town Power Distribution Project, Phase-II”.BPDBCompleted (Oct.’ 1999 to June’ 2005)
81Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Harogram 33/11 KV Sub-station commanding area and its adjoining important areas (Group-A) under Greater Rajshahi Power Distribution Project, Phase-II.BPDBCompleted (Nov.’ 1999 to June’ 2005)
82Consultancy Services for Survey, Planning, Design and Supervision of Lines and Sub-station Works within Katakhali 33/11 KV Sub-station commanding area, Natore Municipality area and its adjoining important areas including 132 KV Natore-Rajshahi Line (Group-C) under Greater Rajshahi Power Distribution Project, Phase-II.BPDBCompleted (Nov.’ 1999 to June’ 2005)
83Study & Preparation of Quarterly Reports of Energy Sectoral updates in Bangladesh. JBICCompleted (Aug.’ 2003 to July’ 2004)
84M&E Consultancy for construction of new factory of Hop Lun (BD) Ltd. at Dhaka Export Processing Zone, Savar, Dhaka. Hop Lun (BD) Ltd.Completed (Aug.’ 2003 to Dec.’ 2004)
85USAID/BANGLADESH – Improved Performance of Bangladesh Energy Sector – Work PlanUSAID/BDCompleted
86Consultancy Services for Identification, Verification, Valuation and Recording of Fixed Assets and Stores of all Unit Offices under the Payment Jurisdiction of Shahjibazar Regional Accounting Offices (RAO), Bangladesh Power Development Board.PBDBCompleted (May, 2000 to June, 2004)
87System Loss Reduction Pilot Scheme of BPDB and Loss Reduction Pilot Project of DESA in Association with Tokyo Electric Power Services Company Limited (TEPSCO), JapanBPDB/
DESA
Completed (Oct.’ 1996 to June’ 2004)
88Retainer Consultancy Services for Sylhet Palli Bidyut Samity-2BREBCompleted (Feb’ 1997 to Aug’ 2003)
89Preparing Staking Sheets and other Related Works of Naogaon District, under Barind Deep Tubewell electrification projects of BMDABMDACompleted (March’ 2002 to June, 2003)
90Feasibility Study of Greater Chittagong Power Distribution Project, Phase-IIIBPDBCompleted (Oct’ 1996 to July’ 1997)
91Rehabilitation and Expansion of Power System in Off-shore Island of Hatiya Damaged by Cyclone and Tidal Surge under Cyclone Damaged Rehabilitation ProjectBPDBCompleted (March’ 1993 to June’ 1997)
92Bangladesh Power Sector Reform Study, Ministry of Energy and Mineral Resources (MEMR), GOB (Consultancy Services as Local Associates of London Economics of UK).MEMRCompleted (July’ 1996 to Dec’ 1996)
9316 Towns Power Distribution Project, Brahman Baria TownBPDBCompleted (March’ 1990 to Aug.’ 1995)
9416 Towns Power Distribution Project, Chandpur Town BPDBCompleted (March’ 1990 to Aug’ 1995)
95Survey of Physical Condition of Existing Union and Other Level MCH and Family Planning Services Infrastructure including Storage Facilities for Family Planning in Bangladesh and Preparation of a Regular Physical Maintenance PlanMOHFWCompleted (Nov’ 1992 to Aug’ 1993)
96Consumer Census of Chittagong Electric Supply,
Lot-1, BPDB
BPDBCompleted (Oct’ 1990 to Nov’ 1992)
97Survey of Assets of Dhaka Electric Supply, Group-C, BPDB (Now DESA)BPDBCompleted (June’ 1991 to March’ 1992)
98Survey of Semi-Pucca Buildings of Banshkhali and Kutubdia Thanas (Former Upazila) Damaged by the Devastating CycloneBRACCompleted (Aug.’ 1991 to Oct.’ 1991)
9933/11 KV Sub-station Design, Renovation and Augmentation of Distribution System of Chittagong Port Authority (CPA)CPACompleted (Aug’ 1987 to Dec, 1990)
100Planning and Design, Estimating and Preparation of Tender Document for Construction of Electrical Distribution System in Padma Residential Area under Rajshahi Development Authority (RDA), Rajshahi.RDACompleted (Nov.’ 1989 to June, 1990)
101Surveying and mapping of D.C.S sheets (1:1200 scale) at Keraniganj Area under GDPDP, DESA (Former BPDB). BPDBCompleted’ 1990 to July’ 1990
102Action Plan for Performance Improvement of Bangladesh Power Development Board for Improvement of Present Engineering Practices, Safety Rules and Procedures in Association with Coopers and Lybrand Deloitte of UKBPDBCompleted (Sep’ 1990 to Nov’ 1990)
103Supplying of Local Consultancy Services for Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Narayanganj Circle GDPDP, DESA (Former BPDB).BPDBCompleted May’ 1989 to June’ 1990
104Barind Integrated Irrigation Pump Electrification Project (BIIPEP)BPDBCompleted (Oct’ 1988 to April’ 1990)
105Surveying, Mapping, Inspection and Planning of 11 KV and 400 Volts Distribution System under Mirpur Circle, GDPDP, DESA (Former BPDB)BPDBCompleted (Jan’ 1988 to April’ 1989)
ankara escort çankaya escort çankaya escort escort bayan çankaya istanbul rus escort eryaman escort ankara escort kızılay escort istanbul escort ankara escort ankara escort escort ankara istanbul rus Escort atasehir Escort beylikduzu Escort Ankara Escort malatya Escort kuşadası Escort gaziantep Escort izmir Escort