ongoing_engg_projects

Engineers Associates Limited (EAL) has been providing consultancy services to various clients in different fields since the inception of the firm in 1985. EAL has broadened the field of activities and they now cover almost every aspect from preliminary study to final design, construction supervision and commissioning in all its ramifications as per requirement of the client. EAL now enjoys a reputation for its commitment to provide the highest level of professional services.

EAL has completed the following engineering projects with with a very high client satisfaction.

Sl. No.
Name of Project
ClientsConsultancy FeesStatus/ Project Period
1Consultant Services for Survey, Planning, Design and Supervision of Lines and Sub-station Construction and Renovation Works of Mymensingh S&D – 1, Mymensingh S&D – 2 and Sherpur ESU and adjoining areas under Central Zone Power Distribution Project, BPDB, Mymensingh. (Package no. – 03).BPDB18.7On-going
(Jan. 2011 to Dec. 2013)
(Applied for time extension)
2Retainer Consultancy Services for Sherpur Palli Bidyut SamitySherpur PBS9.5On-going
(Dec 10, 2011
to Nov 30, 2014)
3Retainer Consultancy Services for Gopalganj Palli Bidyut SamityGopalganj PBS10.8On-going
(Dec 01, 11 to Nov. 30, 2014)
4Engineering Supervision & Design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity Under REEDDP-1 ProjectREB4.987On-going
(April 31, 2011 to Jun 30, 2014)
5Engineering Supervision & Design for Electrical Distribution System of Sherpur Palli Bidyut Samity Under REEDDP-1 ProjectREB2.701On-going
(April 2011 to June 2014)
6Consulting services of Engineering, Supervision & design for Electrical Distribution System of Gopalgonj Palli Bidyut Samity under REEGPBS ProjectREB2.7On-going
(Jan 25, 2012 Jun. 24, 2014)
7Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Gopalgonj PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion ProjectREB10.5On-going
(Sep. 23, 2012 to Mar. 22, 2016
8Consulting Services of Engineering, Supervision & Design for Electrical Distribution System of Sherpur PBS Under 1.8 Million Consumer Connection Through Rural Electrification Expansion ProjectREB14.2On-going
(Sep. 23, 2012 to Mar. 22, 2016)
9Consultancy Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Haluaghat, Gauripur, Eshorganj, Dapunia, Fulbaria, Fulpur, Nalitabari, Nokla, Shreebordi and Jhenaighati ESU under Central Zone Power Distribution Project, BPDB, Mymensingh (Package no. – 07)BPDP20.52On-going
(Dec. 2013 to Jun. 2014)

10Consultant Services for Survey, Planning, Design and Supervision of Construction and Renovation works of Distribution Lines of Kalihati, Sokhipur, Bhuapur, Ghatail, Shorishabari, Trishal and Gaforgaon ESU under Central Zone Power Distribution Project, BPDB (Package no. – 08)BPDP20.79On-going
(Dec. 2013 to Jun. 2014)
11Consultancy Services for Preparation of Drawing, Design, Engineering and Supply of Supervisory Personal for Construction of 33/11kV Regular type and 33/11 kV Rural type Sub-Stations at different locations under Central Zone Power Distribution Project. (Package No. – 09)BPDP23.5On-going
(Dec. 2013 to Jun. 2014)
12JICA Project: Survey on Power System Master Plan 2015TEPSCO, JapanUSD 14,000On-going (October. 29, 2014 to Mar 25, 2016)
13Technical Examination, Operation and Maintenance Survey for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPSCO & TEPCO, JapanUSD 40,000On-going (Nov. 27, 2014 to Mar 25, 2016)
14Technical Examination, Hydro Power Survey for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPSCO & TEPCO, JapanUSD 40,000On-going (Nov. 27, 2014 to Mar 25, 2016)
15Technical Examination, Port Survey for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPSCO & TEPCO, JapanUSD 40,000On-going (Nov. 27, 2014 to Mar 25, 2016)
16JICA Project: Survey on Data Collection Survey on Electricity Interconnectivity among Neighboring Countries in Bangladesh TEPCO, JapanUSD 8,000On-going (Nov. 16, 2014 to Feb 29, 2016)
17Technical Examination of Related Information for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPSCO, JapanUSD 23,000On-going (Nov. 30, 2015 to Mar 30, 2016)
18Survey of Environmental and Social Considerations for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPCO, JapanUSD 18,000On-going (Nov. 30, 2015 to Mar 30, 2016)
19Overall Study of LNG Receiving Terminal for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPCO, JapanUSD 7,000On-going (Nov. 30, 2015 to Mar 30, 2016)
20Survey of Natural Gas Exploration and Supply for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPCO, JapanUSD 7,000On-going (Nov. 30, 2015 to Mar 30, 2016)
21Data Collection/Processing and Stakeholders Relations for Primary Energy Supply and Demand for JICA’s Survey on Power System Master Plan 2015 in BangladeshTEPCO, JapanUSD 20,000On-going (Nov. 30, 2015 to Mar 30, 2016)